Fajny Dom phase IV
Fragment of a residential and service complex, composed of two residential 5-storey buildings with garages on the ground floor (H1-H2), located along the Łęgówka stream.
The H1 and H2 buildings were designed in the square-like top view, with the disc and slab frame made in the RCC technology, filled with walls made from medium-sized hollow brick, with a circulation core in the center, which stiffens the structure. Flats are located on upper floors (from storey 1 upwards), while the ground floor holds the entrance zone with technical rooms and utility rooms, plus individual closed garages accessible from the street level. Walls on the ground floor - at the main entrance to the buildings - designed in a concrete brick cladding (chopped texture). Other external walls plastered (render coating); colour: cream with grey fragments (balcony tiling).
The concept provides for compositional separating of the ground floor and vertical plates in the building corners with plaster of contrasting colouring (chocolate brown).
| 1.Number of underground floors | 0 |
| 2.Number of overground floors | 5 |
| 3.Ground floor level | +0.00= 199.65 above sea level |
| 4.Total floorage | 1,966.62m² |
| 5.Floorage | 1,633.06m² |
| 6.Floorage – utility rooms and technical rooms | 43.62m² |
| 7.Floorage – circulation spaces - staircases and entrance enclosures with halls | 184.71m² |
| 8.Floorage - garages | 199.04m² |
| 9.Floorage - flats | 1,205.69v |
| 10.Internal cube | 6,201.00m³ |
| 11.Number of flats | 28 |
| 12.Number of residents | 60 |
| 13.Number of parking spaces in the garage | 12 |
Customer:
Sołtysowska Project Development Sp. z o.o.
Contract Value:
7 712 065 / 1 928 016.25 EUR
1 EUR = 4.00
Year:
04/2013 – 06/2014